Installation and construction scope
Enquire about washbasin, toilet and shower positioning, water supply and waste piping according to the bathroom design. Early coordination with waterproofing, tiling and finishes reduces rework.
For a villa, house or annex, send your area, available photos or drawings and required water and drainage points. Scope, availability and cost are reviewed before work is agreed.
Enquiry areas
New bathroom rough-in
Basin and shower connections
Plumbing before finishes
How to enquire
Share whether this is a new build or renovation, Abu Dhabi location, number of bathrooms, kitchens or connection points, and available drawings or photos. Ask about inclusions, materials, schedule and applicable approvals before work starts.
Enquire via WhatsAppFrequently asked questions
When should bathroom plumbing start?
Connection points should be agreed after design and before concealed walls, floors and final finishes.
What details are needed?
Send bathroom dimensions, available drawings, fixture count and site location.