Installation and construction scope
Enquire about hot and cold water lines, supply distribution to bathrooms, kitchens and washbasins, and routing before finishes. Pipe sizing, materials and installation method depend on drawings and site review.
For a villa, house or annex, send your area, available photos or drawings and required water and drainage points. Scope, availability and cost are reviewed before work is agreed.
Enquiry areas
Water lines for villas and annexes
Bathroom and kitchen supply points
Routing changes before finishing
How to enquire
Share whether this is a new build or renovation, Abu Dhabi location, number of bathrooms, kitchens or connection points, and available drawings or photos. Ask about inclusions, materials, schedule and applicable approvals before work starts.
Enquire via WhatsAppFrequently asked questions
Can piping be installed before tiling?
Concealed pipework is typically coordinated and tested before walls and floors are closed. The sequence depends on the site and project plan.
How can I request an estimate?
Share location, drawings if available, bathroom and kitchen counts and photos for scope review.