Installation and construction scope
Enquire about internal water supply and waste lines, kitchen and bathroom connection points and sanitary fixture rough-ins. Execution depends on approved plans, applicable requirements and confirmation of scope and permits with the relevant parties.
For a villa, house or annex, send your area, available photos or drawings and required water and drainage points. Scope, availability and cost are reviewed before work is agreed.
Enquiry areas
New villa plumbing rough-in
Annex and majlis plumbing
Coordination with construction stages
How to enquire
Share whether this is a new build or renovation, Abu Dhabi location, number of bathrooms, kitchens or connection points, and available drawings or photos. Ask about inclusions, materials, schedule and applicable approvals before work starts.
Enquire via WhatsAppFrequently asked questions
Can I enquire before construction begins?
Yes. Send available drawings, site location and desired scope to assess the enquiry.
Is there a fixed price per metre?
A reliable price requires connection counts, materials, drawings and site conditions.